Home / Smart Hardware

How to adjust the programmable pulse controller

time:2025-06-30 09:01:13 Smart Hardware

How to set up the programmable pulse controller

 Programmable Pulse Dust Control Instructions for Use

1. After the controller is connected to the power supply, the power indicator lights up, and the digital tube displays the sequence from "0", returns to the final position, and then carries out a new cycle.

2. The pulse width and pulse interval are increased in a clockwise direction and decreased in a clockwise direction. The longer the pulse width tube is bright, the wider the pulse width. V1 is the working voltage of the digital circuit (DC12V), V2 is the working voltage of the solenoid valve (DC24V), BL1 is the AC power fuse behind the controller, BL2 is the +12V power fuse, and BL3 is the solenoid valve working power fuse 1A.

3. When replacing the fuse, please press the original current value, please do not increase or decrease it at will, so as to avoid accidents.

《How to adjust the programmable pulse controller》 This does not represent the views of this website. If there is any infringement, please contact us to delete it.

Ranking

Digital Insights